top of page
Frame 122.png
Modern Office Space

Achievements That Speak Louder Than Words

Highlights & Wins

From groundbreaking projects to measurable impact — here’s a look at what we’ve accomplished along the way.

GROW FASTER

Helping you grow faster with strategy, systems, and execution excellence.

Our vision fuels every move

Sectors We Transform

From groundbreaking projects to measurable impact — we don’t just deliver solutions, we create long-term value across industries by modernising systems, scaling innovation, and driving real transformation.

 Kitchen Appliances & Cookware

Pressure Cooker

Non Stick Cookware

Gas Stove Assembly

Outer Lid Pressure Cooker

Project 

  • Redesign Factory Layout

  • Lean Inventory Management System

  • Pull Based Planning

Stylish Modern Kitchen

Benefits Delivered

  • Increased Overall Output of the Plant by 150%

  • Reduced WIP & Production Lead time by 90%

  • Improved Productivity by 77%

  • Reduced shortages by >95%

  • Reduced packaging material inventory to 5 days from 30 days

  • Overall Plant Inventory reduced by 33%

  • Increased Overall Output of the Plant by 30%

  • Improved Productivity by 43%

Luggage & Travel Accessories

Trolley Bags

Office Bags

Project 

  • Supply Chain Mangement

  • Warehouse Design

Luggage Store

Benefits Delivered

  • Eliminated Stock-outs

  • Increased SKU Availability in the Warehouse

  • Improved Efficiency & Space Utilisation

Opal ware

Dinner Sets (Opal)

Office Bags

Project 

  • Productivity Improvement (Packaging Area)

  • Warehouse Design

Blue and White China

Benefits Delivered

  • Increased Productivity by >125%

  • Eliminated the need for a complete shift in the packaging area

  • Reduced kitting time for Product change in Assembly from 20 minutes to 2 minutes (Reduced by 90%)

  • Designed the warehouse for the storage of 5000 pallets

FMCG

Chocolates

Candy

Wafer

CaSpices & Corn Flakesndy

Project 

  • Productivity Improvement

  • Inventory Management

  • Inventory Management for Third Party

Bonbon Assortment

Benefits Delivered

  • Eliminated Online shortages

  • Reduced Inventory of packaging material by 30%

  • Reduced stockouts by >90%

  • Inventory Value reduced by 30%

  • Manpower Cost reduced by 

  • Productivity Improvement 42% for Candy

  • Productivity Improvement 33% for Gum

  • Increased Overall Output by 22%

  • Productivity Improvement by 27%

  • Reduced inventory value by 1 Cr in 2 months

  • Setup a system to reduce shortages & Expedited Shipping Cost

Furniture

Chair Manufacturing

Office Bags

Project 

  • Pull based Planning &Scheduling

  • Inventory Management (RM & FG)

Work Space

Benefits Delivered

  • FG Inventory reduced by 37%

  • RM Inventory reduced by 41%

  • Overall Plant Capacity Increased by 45%

  • Productivity Increased by 39%

Automobile

Auto Parts

2 Wheeler (Spares)

Project 

  • Quality Improvement Initiative

  • Layout for Machine Shop

  • Changeover Time Reduction

Car Lift

Benefits Delivered

  • Reduce Customer End Rejection by 98%

  • Productivity Increased by >300%

  • Production Lead Time Reduced by more than >50%

  • 50% reduction in changeover time

  • 52% reduction in WIP

  • 10% productivity improvements (through Kaizens)

Iron & Steel

Castings

Steel Coils

Shelving Racks/ Pallets

Shelving Racks/ Pallets

Project 

  • Pull-based Planning & Scheduling

  • Quality Improvement

  • Kaizen

A man using a machine to cut iron bar

Benefits Delivered

  • FG Inventory reduced by 37%

  • RM Inventory reduced by 41%

  • Overall Plant Capacity Increased by 45%

  • Productivity Increased by 39%

Packaging & Printing

 Decal & Motifs (Screen Printing)

Laminates

Project 

  • Quality Improvement

  • Productivity Improvement

  • Pull based Planning & Scheduling

Ecommerce

Benefits Delivered

  • Reduced rejections from 41% to 12%

  • Increased output per person by 90%

  • Bottom line impact of >7.4 Cr/ annum

  • Reduced Production Lead Time by 67%

  • Improved On-Time performance by >90%

  • Increased Overall Plant Capacity by 39% (Through SMED)

Working on Rooftop

Sectors We Transform

From groundbreaking projects to measurable impact — we don’t just deliver solutions, we create long-term value across industries by modernizing systems, scaling innovation, and driving real transformation.

Frequently asked questions

Sanitary Ware

CP Fittings

PVC Pipes

Project 

  • Productivity Improvement

  • Pull-based Planning & Scheduling

  • Quality Improvements

Choosing PVC Pipes

Benefits Delivered

  • Reduced manpower cost per piece by 29%

  • Improved On-Time delivery by >95%

  • Reduced WIP by 55%

  • Increased Plant Turnover by Unlocking Capacity by 36%

  • Reduced rework by 36%

Working from a Cafe

Ready to Transform Your Operations

Construction

Aluminium Gates

Steel Coils

Project 

  • Critical Chain Project Management

Construction Pre-Planning

Benefits Delivered

  • Reduced Site Measurement Lead Time by 50%

  • Reduced Overall  Design Lead Time by 35%

  • Revision in Drawings reduced by 66%

  • The rework cost of the product has been reduced by 50%

  • Quotation Lead Time reduced by 91%