Achievements That Speak Louder Than Words
Highlights & Wins
From groundbreaking projects to measurable impact — here’s a look at what we’ve accomplished along the way.
GROW FASTER
Helping you grow faster with strategy, systems, and execution excellence.
Our vision fuels every move
Sectors We Transform
From groundbreaking projects to measurable impact — we don’t just deliver solutions, we create long-term value across industries by modernising systems, scaling innovation, and driving real transformation.

Kitchen Appliances & Cookware
Pressure Cooker
Non Stick Cookware
Gas Stove Assembly
Outer Lid Pressure Cooker
Project
-
Redesign Factory Layout
-
Lean Inventory Management System
-
Pull Based Planning

Benefits Delivered
-
Increased Overall Output of the Plant by 150%
-
Reduced WIP & Production Lead time by 90%
-
Improved Productivity by 77%
-
Reduced shortages by >95%
-
Reduced packaging material inventory to 5 days from 30 days
-
Overall Plant Inventory reduced by 33%
-
Increased Overall Output of the Plant by 30%
-
Improved Productivity by 43%
Luggage & Travel Accessories
Trolley Bags
Office Bags
Project
-
Supply Chain Mangement
-
Warehouse Design

Benefits Delivered
-
Eliminated Stock-outs
-
Increased SKU Availability in the Warehouse
-
Improved Efficiency & Space Utilisation
Opal ware
Dinner Sets (Opal)
Office Bags
Project
-
Productivity Improvement (Packaging Area)
-
Warehouse Design

Benefits Delivered
-
Increased Productivity by >125%
-
Eliminated the need for a complete shift in the packaging area
-
Reduced kitting time for Product change in Assembly from 20 minutes to 2 minutes (Reduced by 90%)
-
Designed the warehouse for the storage of 5000 pallets
FMCG
Chocolates
Candy
Wafer
CaSpices & Corn Flakesndy
Project
-
Productivity Improvement
-
Inventory Management
-
Inventory Management for Third Party

Benefits Delivered
-
Eliminated Online shortages
-
Reduced Inventory of packaging material by 30%
-
Reduced stockouts by >90%
-
Inventory Value reduced by 30%
-
Manpower Cost reduced by
-
Productivity Improvement 42% for Candy
-
Productivity Improvement 33% for Gum
-
Increased Overall Output by 22%
-
Productivity Improvement by 27%
-
Reduced inventory value by 1 Cr in 2 months
-
Setup a system to reduce shortages & Expedited Shipping Cost
Furniture
Chair Manufacturing
Office Bags
Project
-
Pull based Planning &Scheduling
-
Inventory Management (RM & FG)

Benefits Delivered
-
FG Inventory reduced by 37%
-
RM Inventory reduced by 41%
-
Overall Plant Capacity Increased by 45%
-
Productivity Increased by 39%
Automobile
Auto Parts
2 Wheeler (Spares)
Project
-
Quality Improvement Initiative
-
Layout for Machine Shop
-
Changeover Time Reduction

Benefits Delivered
-
Reduce Customer End Rejection by 98%
-
Productivity Increased by >300%
-
Production Lead Time Reduced by more than >50%
-
50% reduction in changeover time
-
52% reduction in WIP
-
10% productivity improvements (through Kaizens)
Iron & Steel
Castings
Steel Coils
Shelving Racks/ Pallets
Shelving Racks/ Pallets
Project
-
Pull-based Planning & Scheduling
-
Quality Improvement
-
Kaizen

Benefits Delivered
-
FG Inventory reduced by 37%
-
RM Inventory reduced by 41%
-
Overall Plant Capacity Increased by 45%
-
Productivity Increased by 39%
Packaging & Printing
Decal & Motifs (Screen Printing)
Laminates
Project
-
Quality Improvement
-
Productivity Improvement
-
Pull based Planning & Scheduling

Benefits Delivered
-
Reduced rejections from 41% to 12%
-
Increased output per person by 90%
-
Bottom line impact of >7.4 Cr/ annum
-
Reduced Production Lead Time by 67%
-
Improved On-Time performance by >90%
-
Increased Overall Plant Capacity by 39% (Through SMED)

Sectors We Transform
From groundbreaking projects to measurable impact — we don’t just deliver solutions, we create long-term value across industries by modernizing systems, scaling innovation, and driving real transformation.
Frequently asked questions
Sanitary Ware
CP Fittings
PVC Pipes
Project
-
Productivity Improvement
-
Pull-based Planning & Scheduling
-
Quality Improvements

Benefits Delivered
-
Reduced manpower cost per piece by 29%
-
Improved On-Time delivery by >95%
-
Reduced WIP by 55%
-
Increased Plant Turnover by Unlocking Capacity by 36%
-
Reduced rework by 36%

Ready to Transform Your Operations
Construction
Aluminium Gates
Steel Coils
Project
-
Critical Chain Project Management

Benefits Delivered
-
Reduced Site Measurement Lead Time by 50%
-
Reduced Overall Design Lead Time by 35%
-
Revision in Drawings reduced by 66%
-
The rework cost of the product has been reduced by 50%
-
Quotation Lead Time reduced by 91%